Old business first!
- Diamonds and Triangles Stole from Victorian Lace Today: Active-ish. It's around, but not top priority.
- Kiila, the mystery sock for May: Active - near the end! Just have about 27 rows of the cuff left to do.
- Amelia cardigan: Sleeping. It's too warm to think about an alpaca/wool sweater.
- Lilac Leaf Shawl: Active-ish. It's around. I'm pretty worried that I'll need to cut out several repeats in the middle and try to block it out longer. We'll see.
New Business!
- Laminaria Shawl: So happy to have this one on the needles. It's still in the first motif, so there's a long way to go.
- Pink granite socks: Plain stockinette socks for easy knitting in pink and grey yarn.
Plotting:
- Nancy Bush socks: The June sock challenge is to design your own or knit a Nancy Bush pattern. I'm thinking Nancy Bush, though I haven't decided what pattern or yarn, precisely. I'll cast on when I finish the Kiila's.
- Sock Yarn Scarf: The local LYS is running a contest for scarf design out of sock yarn and I think I'm going to take the opportunity to try my hand at designing a scarf. I have the yarn and I have some ideas....
Goals:
- Finish Kiila's
- Turn the next corner on the diamonds and triangles shawl
- Cast on for the Nancy Bush socks
- Get the scarf design swatched, written, and started
Showing posts with label Status post. Show all posts
Showing posts with label Status post. Show all posts
Friday, June 5, 2009
Tuesday, May 5, 2009
5th of the month project status post: May edition
Old business first!
- Eliina Shawl: Done!
- Simurgh Stole: Done!
- Sondermuster Darmstadt socks: Done!
- Diamonds and Triangles Stole from Victorian Lace Today: Active. I've rounded the first corner, for better or worse.

- Frosted Ferns doily: Frogged! I'm free! Free from the doily!
- Selbu Mittens from Folk Mittens: I have declared this mitten finished. It is not a pair, but merely a sad sorry single mitten. But by declaring it done, I don't have to think about it again!
New Business!
I've had kind of a casting on fit and I now have four projects (including the diamonds and triangles stole from above) in heavy rotation. A row here, a row there, and they grow!
- Kiila, the mystery sock for May: I've got a couple inches on both socks so far. Need to hurry up and get to 5.5" before Friday. Knitting it up in my pretty green Dream in Color Smooshy.
- Amelia cardigan: Knitting it up in black lano d'oro and loving it. I hope I have enough yarn...

- Lilac Leaf Shawl: I just finished the first edge and am into the body repeats. It's a nice pattern, but I had some trouble with the nupps. And I dropped a stitch at one point, leading to the following trouble.

Do you see it there? On the left? I fixed it... kinda. Not by frogging or doing surgery. I made a yo and then sewed the loop down on the back. It's still not perfect, but it's a lot less obvious now. I don't have an after photo yet... maybe another day.
Hopefully the cast on frenzy has passed and I can get on with the knitting.
- Eliina Shawl: Done!
- Simurgh Stole: Done!
- Sondermuster Darmstadt socks: Done!
- Diamonds and Triangles Stole from Victorian Lace Today: Active. I've rounded the first corner, for better or worse.
- Frosted Ferns doily: Frogged! I'm free! Free from the doily!
- Selbu Mittens from Folk Mittens: I have declared this mitten finished. It is not a pair, but merely a sad sorry single mitten. But by declaring it done, I don't have to think about it again!
New Business!
I've had kind of a casting on fit and I now have four projects (including the diamonds and triangles stole from above) in heavy rotation. A row here, a row there, and they grow!
- Kiila, the mystery sock for May: I've got a couple inches on both socks so far. Need to hurry up and get to 5.5" before Friday. Knitting it up in my pretty green Dream in Color Smooshy.
- Amelia cardigan: Knitting it up in black lano d'oro and loving it. I hope I have enough yarn...
- Lilac Leaf Shawl: I just finished the first edge and am into the body repeats. It's a nice pattern, but I had some trouble with the nupps. And I dropped a stitch at one point, leading to the following trouble.
Do you see it there? On the left? I fixed it... kinda. Not by frogging or doing surgery. I made a yo and then sewed the loop down on the back. It's still not perfect, but it's a lot less obvious now. I don't have an after photo yet... maybe another day.
Hopefully the cast on frenzy has passed and I can get on with the knitting.
Sunday, April 5, 2009
5th of the month project status post
Knitting:
- Eliina Shawl: Active. My brainless knitting project, excellent for action films and subtitles. I've done 5 of 10 repeats of the body pattern, which does not mean I'm half done, oh no no.
- Simurgh Stole: Active. Halfway through the second motif on the second half of the shawl. The end is in sight.
- Sondermuster Darmstadt socks: On the table. Not quite active, but ready to be picked up at my whim. Little more than toe stubs at this point. Doing two at a time, toe up.
- Diamonds and Triangles Stole from Victorian Lace Today: Drowsy. In the project bag, and comes out when the whim hits (which is rarely). I'm almost all the way done with attaching the edging on the first long side. It saw some knitting action in the past month, but not in the several months before that.
- Frosted Ferns doily: Dormant. Possibly in the frog pond. There are just too many other things I'd rather do that make a doily on size 0 needles.
- Selbu Mittens from Folk Mittens: Dormant. I knit one in the fall and got no joy from it. I should probably finish the second one to prove it can be done, but... meh.
Spinning:
- Cranberry Merino: Mostly done! Just a little bit left to spin, then we'll see if I did better at spinning a single than with the first spindlefull.
Plotting:
- Sweater? With the black yarn I got yesterday I've been plotting a sweater. I'm thinking the Mirabella Cardigan, but with longer sleeves and minus the ridiculous collar.
- Sweater vest? I have 10 hanks of Elsbeth Lavold Silky tweed in a brilliant blue that want to be...something. Maybe Honeycomb?
- New shawl project? Not until two of the three current shawl projects are finished.
- Eliina Shawl: Active. My brainless knitting project, excellent for action films and subtitles. I've done 5 of 10 repeats of the body pattern, which does not mean I'm half done, oh no no.
- Simurgh Stole: Active. Halfway through the second motif on the second half of the shawl. The end is in sight.
- Sondermuster Darmstadt socks: On the table. Not quite active, but ready to be picked up at my whim. Little more than toe stubs at this point. Doing two at a time, toe up.
- Diamonds and Triangles Stole from Victorian Lace Today: Drowsy. In the project bag, and comes out when the whim hits (which is rarely). I'm almost all the way done with attaching the edging on the first long side. It saw some knitting action in the past month, but not in the several months before that.
- Frosted Ferns doily: Dormant. Possibly in the frog pond. There are just too many other things I'd rather do that make a doily on size 0 needles.
- Selbu Mittens from Folk Mittens: Dormant. I knit one in the fall and got no joy from it. I should probably finish the second one to prove it can be done, but... meh.
Spinning:
- Cranberry Merino: Mostly done! Just a little bit left to spin, then we'll see if I did better at spinning a single than with the first spindlefull.
Plotting:
- Sweater? With the black yarn I got yesterday I've been plotting a sweater. I'm thinking the Mirabella Cardigan, but with longer sleeves and minus the ridiculous collar.
- Sweater vest? I have 10 hanks of Elsbeth Lavold Silky tweed in a brilliant blue that want to be...something. Maybe Honeycomb?
- New shawl project? Not until two of the three current shawl projects are finished.
Subscribe to:
Posts (Atom)